Third wind turbine blade breaks in East Central Illinois

OAKWOOD — For the third time in 17 months, a wind turbine blade manufactured by General Electric has broken off at an East Central Illinois wind farm.

The latest incident occurred about 9 p.m. Nov. 20 in Vermilion County at the California Ridge Wind Farm operated by Chicago-based Invenergy. Another turbine blade broke in that same wind farm in November 2012, following a June 2012 blade break at the Settlers Trail Wind Farm near Sheldon, operated by Chicago-based E.On Climate & Renewables.

All three blades were on 1.6-megawatt turbines manufactured by GE.

“We are working with GE, the turbine manufacturer, to determine the cause of this incident,” a statement from Invenergy said Friday.

Last March, GE issued a statement saying that an “isolated manufacturing issue” caused the two wind turbines to break in 2012. GE said it had “reviewed the wind farm fleets at both sites to ensure their continued reliability and performance” and “have addressed the manufacturing issue to prevent this from happening in the future.”

Lindsay Theile, GE Power & Water spokesman, said in an email Friday that “since the (Nov. 20) break is currently being investigated, we cannot speculate the cause of the break.

“With any customer event, our process is to assign a team to perform a thorough investigation,” Theile said. “It’s our goal to perform thorough root cause analyses, take appropriate corrective action and bring the turbines back online as soon as possible.”

Invenergy said the blade broke off and fell to the ground near the base of the turbine, which is located near the intersection of 2150 North Road and 900 East Road near Oakwood.

“We believe that as this blade fell, it hit a second blade on the same turbine, causing that second blade also to break off and fall to the ground near the base,” the statement said. “As designed, the turbine automatically ceased operation. No one was injured.”

Invenergy’s 217-megawatt, 134-turbine California Ridge Wind Farm has been in operation since 2012. There are 30 turbines in Champaign County and 104 in Vermilion County.

E.On’s 150-megawatt, 94-turbine Settlers Trail Wind Farm was built in 2011 and is the second operational wind farm in Illinois for E.On. The firm also owns the Pioneer Trail Wind Farm near Paxton.

E.On last year said a turbine breaking is a “rare event for us.”

Comments

The Paxton Record embraces discussion of both community and world issues. We welcome you to contribute your ideas, opinions and comments, but we ask that you avoid personal attacks, vulgarity and hate speech. we reserve the right to remove any comment at its discretion, and we will block repeat offenders' accounts. To post comments, you must first be a registered user, and your username will appear with any comment you post. Happy posting.

Login or register to post comments

Mary Kay Barton wrote on November 23, 2013 at 10:11 am

So, if I'm understanding this article correctly, there has been 3 blade breaks in the past 17 months just in Illinois.  People need to know that these blade breaks are not exclusive to Illinois. 

Another GE 1.6-100 blade break just occurred here in Western New York State at Invenergy's newly-built Orangeville project just last Sunday (11/17/13).  And, there was another one in Michigan just a few weeks ago --- And, another one in Michigan earlier this year. 

Guess these blade breaks aren't as "rare" as industry reps would have everyone believe.  This affirms the fact that these giant pieces of junk do NOT belong sited anywhere near where people live! See:

Invenergy's Orangeville wind factory operations suspended after turbine blade breaks Sunday morning, November 17, 2013:
http://thedailynewsonline.com/news/article_3de1e860-4fea-11e3-8ebb-0019bb2963f4.html#.Uol1rO5eyCo.email


GE Blade crashes to the ground during testing (Michigan):
http://www.nawindpower.com/e107_plugins/content/content.php?content.12275

  GE blade breaks off Michigan turbine:http://www.rechargenews.com/wind/americas/article1343662.ece

melisabush21 wrote on November 25, 2013 at 2:11 am

Shocking fact to me that 17 months just in Illinois. Angeljackets